Steam Power Stations
SPP KARDIA
District heating of Ptolemaida
Completion period: September 2021 - October 2021
Project Owner: PPC
Contractor: Solergon
Location: Kardia Thermoelectric Power Station, Kozani
Description of works: Electrical works for the installation of two (2) water heating boilers of 80 MW thermal capacity, for the district heating of Ptolemaida.
Boiler Room of Unit II
Completion period: January 2009–March 2009
Contractor: PPC
Location: Kozani
Description of works: Electrical restoration of the damaged from fire boiler room.
SPP AGIOS DIMITRIOS
Desulphurisation of UNIT V
Completion period: September 2021 – January 2023
Project Owner: P.P.C.
Contractor: AVAX S.A.
Location: S.P.P. Agios Dimitrios, Kozani
Description of works: Installation of electrical equipment, cable trays, cables and instrumentation in several areas of the Project.
Desulphurisation of UNIT V
Completion period: May 2021 - August 2021
Project Owner: P.P.C.
Contractor: AVAX S.A.
Location: Kozani
Description of works: Installation of Busducts for the exhaust gasses Desulphurisation System of Unit V, in Agios Dimitrios thermoelectric power station.
Exhaust gas analyzers
Completion period: 2008
Project Owner: PPC
Contractor: TCB
Location: Kozani
Description of works: Installation of exhaust gases analyzers for pollution measurements in all Units.
Upgrading of DCS System in Units III & IV
Completion period: 2007
Contractor: PPC
Location: Kozani
Description of works: Complete replacement of the Distributed Control System (DCS).
Electrostatic Precipitators of Units I - IV
Completion period: 2005–2007
Project Owner: PPC
Contractor: RODAX
Location: Kozani
Description of works: Electrical installation of new electrostatic precipitators and ash handling system.
Restoration of Engine Room of Unit II
Completion period: 2000-2001
Project Owner: PPC
Contractor: J / V ALSTOM-METKA
Location: Kozani
Description of works: Electrical restoration of damaged by fire Engine Room.
Sout blowers system of Boilers in Units III & IV
Completion period: 1997-1999
Project Owner: PPC
Contractor: METKA
Location: Kozani
Description of works: Automation of sout blowers system.
Electrical installation Unit V
Completion period: 1995-1996
Project Owner: PPC
Contractor: AEGEK
Location: Kozani
Description of works: Electrical installation of lighting, data-telecommunication-loudspeakers systems, fire detection, fire fighting, heating, ventilation and air-conditioning.
Unit V conveyor belts system
Completion period: 1994-1996
Project Owner: PPC
Contractor: METKA
Location: Kozani
Description of works: Electrical installation, testing and commissioning of fly and wet ash conveyors belt system.
SPP MEGALOPOLIS
Desulphurization System of Unit III
Completion period: 2009-2010
Project Owner: PPC
Contractor: ABB
Location: Megalopolis
Description of works: Electrical installation and commissioning of desulphurization system.
Exhaust gases analyzers
Completion period: 2008
Project Owner: PPC
Contractor: TCB
Location: Megalopolis
Description of works: Installation of exhaust gases analyzers for pollution measurements in all Units.
Lignite Crusher Building of Unit IV
Completion period: 1994-1996
Project Owner: PPC
Contractor: J / V HARTMAN & BROWN-BIOKAT
Location: Megalopolis
Description of works: Modification of electrical equipment (switchgears, panels).
Unit IV conveyor belts
Completion period: 1991-1993
Project Owner: PPC
Contractor: AEG HELLAS
Location: Megalopolis
Description of works: Installation of lighting, grounding and control system for the transportation of ash and lignite.
SPP MELITI
Electrical works in Unit
Completion period: 2002-2003
Project Owner: PPC
Contractor: PROMITHEAS GAS
Location: Meliti-Florina
Description of works: Electrical installation of fire detection, fire fighting, air conditioning and cathodic protection.
Electrical works in cooling tower
Completion period: 2001-2002
Project Owner: PPC
Contractor: BLACKE-DURR
ENERGIETECHNIK
Location: Meliti-Florina
Description of works: Electrical study, supply and installation of lighting and fire barriers.
Electrical works in Unit
Completion period: 2000
Project Owner: PPC
Contractor: ABB
Location: Meliti - Florina
Description of works: Installation of lightning protection.
SPP PTOLEMAIDA
Cathodic protection of Unit IV
Completion period: 1996
Contractor: PPC
Location: Ptolemaida
Description of works: Installation of cathodic protection.
Auxiliary transformer of Unit IV
Completion period: 1995
Contractor: PPC
Location: Ptolemaida
Description of works: Electrical restoration of the damaged auxiliary transformer.
Fly Ash processing system of Unit IV
Completion period: 1994–1996
Project Owner: PPC
Contractor: AEGEK
Location: Ptolemaida
Description of works: Electrical installation, testing and commissioning of fly ash processing system.
SPP AMYNTAIO
Cathodic protection
Completion period: 1999
Project Owner: PPC
Contractor: ALSTHOM ATLANTIQUE
Location: Amynteo, Florina
Description of works: Installation of cathodic protection in Units I/III.
Emergency lighting
Completion period: 1989
Project Owner: PPC
Contractor: VIOKAT
Location: Amynteo, Florina
Description of works: Installation of emergency lighting in Units I/II.