News and announcements

    April 2026

Undertaking 
new project

SITHIA KARDIA SPP

    (Kozani, Greece)

    Complete electrical installation works for combined heat and power generation at least 65 MWth

viber_image_2026-05-15_07-58-06-392.jpg

    February 2026

Undertaking 
new project

WIND FARM - LOUZES NAFPAKTOS

    (Nafpaktos)

    Replacement of main wind farm transformer at Louzes location.

viber_image_2026-05-15_08-00-30-612.jpg

    February 2026

Undertaking 
new project

HERON

    (Thebes)

    Complete electrical construction of a 150/20 kV substation at the HERON facilities in Thebes

New Εικόνα Bitmap.jpg

    January 2026

Undertaking
new project

BOOSTER NEA MESIMVRIA 

    (N. Mesimvria, Thessaloniki)

     Complete electrical erection and instrumentation installation works at the natural gas compression station.

New Εικόνα Bitmap.jpg

    September 2025

Undertaking
new project

SUBSTATION 

    (Folegandros)

    Complete electrical construction of a 150 kV GIS substation within the framework of the 4th phase of the Cyclades interconnection.

Blue Digital Grid

    July 2025

Undertaking
new project

550MW PV PARK INTERCONNECTION

    (Ptolemaida Mine)

​     Electrical works for the interconnection of medium voltage cables of a PV park with a total nominal power of 550 MW with the Kardia steam power station

.png

    July 2025

Supply of a new instrument

METREL MI 3116

( PV Analyzer XA)

   

 

Advanced photovoltaic and electrical installation tester. Combines measurements up to 1500V in a single device, ensuring accurate, high-performance testing.

xmi-3116-pv-analyserxabf-set.png.pagespeed.ic.xgcaWL26NJ.webp

    June 2025

Undertaking
new project

PV PARK 450 MW

    (Amyntaion Mine)

    Complete electrical construction of a PV park with a total nominal power of 450 MW.

ΑΙ_Generated_Image_3lkjag3lkjag3lkj.png

    March 2025

Supply of a new
Winch

   THALER Type KE-SP 2030

   (Winch)

    Certified oil cable winch. It has the possibility of continuous recording and a programmable limiter (cutter).

THALER KE-SP 2030.jpg

    February 2025

Undertaking
new project

PV PARK 550 MW

    ( Ptolemaida Mine)

    Complete electrical construction of a PV park with a total nominal power of 550 MW.

ΑΙ_Generated_Image_3lkjag3lkjag3lkj.png

    February 2025

Undertaking
new project

450MW PV PARK INTERCONNECTION

    (Amyntaion Mine)

    Electrical works for the interconnection of medium voltage cables of a PV park with a total nominal power of 450 MW.

.png

    February 2025

Supply of a new reel trailer

TTA 14008-E

    (Reel trailer)

    Certified collapsible cable unwinder that can accept rotors of various types (metal and wood).

TTA 14008-E.jpg

    December 2024

Supply of a new instrument

METREL MI 3280

   (DT Analyser)

The MI 3280 Digital Transformer Analyser is a portable, powered test instrument intended for diagnosing of turn ratio, phase deviation, excitation current and winding resistance of single and three phase transformers.

3280-set.jpg

    December 2024

Supply of a new instrument

Fluke 805 FC

   (Vibration Meter)

805fc-1500x1000.webp

    September 2024

Undertaking
new project

    DESFA OF CENTRAL GREECE

(Ampelia, Municipality of Farsala)

​    Complete electrical installation and erection of instruments of the natural gas compression station

    

20241016_163557.jpg

    July 2024

Supply of a new instrument

    PANDUIT PES400

(Stainless steel label printing machine for cable marking.)

    

PES4.jpg