DIESEL GENERATORS

RHODES

 

Completion period: 2016-2018

Project Owner: PPC  

Contractor: TERNA SA

Location: South Rhodes

Description of works: Electrical installation of seven diesel generators of total capacity 115 MW. Installation of electrical equipment, cable trays, cables, lighting, earthing & grounding. Commissioning & start up.

 

 

APS (AUTONOMOUS PRODUCTION STATION) OF MYKONOS

 

Completion period: June 2009-September 2009

Project Owner: PPC  

Contractor: SOLERGON

Location: Mykonos

Description of works: Electrical installation of 3 diesel engines 5.8 MW each.

 

E/S AEGEAN ISLANDS

 

Completion period: 2008-2012

Project Owner: PPC  

Contractor: SOLERGON

Location: Aegean Islands

Description of works: Electrical installation of sixty one diesel generators of total capacity 61 MW in the following islands:

  • Syros

  • Lesvos

  • Chios

  • Symi

  • Patmos

  • Sifnos

  • Rhodes

  • Mykonos

  • Κύθνος

  • Samos

  • Skyros

  • Astypalea

OLYMPIC GAMES 2004

 

Completion period: 2004

Project Owner: ATHENS 2004  

Contractor: J / V METKA-GE

Location: Athens

Description of works: Installation and operation of emergency diesel generators for supporting of all the Olympic and Paralympics venues during the Olympic Games.

 

APS (AUTONOMOUS PRODUCTION STATION) OF SORONIS

Completion period: 1998

Contractor: PPC  

Location: Soronis, Rhodes

Description of works: Electrical installation, commissioning and start up of new diesel generator.

 

 